當前位置:萬佳範文網 >

自我鑑定 >自我評價 >

工程維修人員英文自我評價(精選5篇)

工程維修人員英文自我評價(精選5篇)

工程維修人員英文自我評價 篇1

years to participate in the work to April has been in Beijing Construction Engineering Construction Engineering Company Limited, a project of any technical work. Mainly to participate in bidding, writing programs and to the end, drawing on-site construction plans, do negotiations, and supervision, Party to deal with, as the completion of plans and so on. in April so far in the construction of an electronic plant in the field of civil engineers (Party on-site representatives). I have been involved in the work for nearly 20 years, working in the construction field for many years, from the initial maintenance, building leakage to the supervision of high-level decoration, high-rise buildings, municipal roads, bridges and so can be described as experienced, , Project deputy manager, project director, project director and other duties. From the grass-roots level to the management to bear the heavy work pressure.

工程維修人員英文自我評價(精選5篇)

I am well aware that only with excellent professional skills, good communication skills and team spirit, in order to effectively carry out their work. At the same time I also use their spare time to actively improve themselves, completed undergraduate self (project management), also successfully passed the two construction division (housing construction, decoration) to test. I am eager to have more room for development in the new environment. Has also been in the Beijing Construction Engineering Group, the construction company for nearly 20 years, long-term engineering projects as chief engineer and project manager, which has served more than 20 million square meters of project total work, and more than 10 million square meters of project Manager, has a wealth of practical experience in construction. Work enthusiasm and initiative, with good interpersonal skills.

工程維修人員英文自我評價 篇2

First of all, I was a farmer's child, grew up in rural areas, the village gave me nurtured into a strong self-reliance, although she is not the city's wonderful, but better able to experience the true story of that struggle, I always think in the countryside Growing up is one of the best life experiences, and later, I carry the others and their own expectations straight up the pole on the university.

The University is a place where I can really grow up. "The university not only taught me the real skills, but more importantly, taught me how to learn and how to look at things in the world in the right and unique way I think this is a better foundation for the creation of the world.

I really do what you like and is a good thing in the study, in addition to poor English, the other is very good, sophomore two semesters I am also familiar with the operation of office software. There autocad is also very familiar with (took a high card) addition to these "business", the amateur I still continue to enrich and improve themselves. A college radio station to do a director and then do vice minister of photography to do radio station deputy stationmaster, along the way I am in my ability to continue to climb in this process also learned a lot of knowledge, such as interpersonal, organizational management - - more importantly, I know what is the responsibility! I am very interested in literature and art, leisure time often as entertainment to study, so writing, sketches, photography, also have a certain ability to control.

I can not get a good car behind closed doors reason I know - the university I can seize all the opportunities to go out to social ersity summer school I organized a "three rural" reservoir safety research activities, experience in the heat Summer job I have seized the opportunity to do two "summer internship" - one for the Fan Yu a drafting company designed to do a month; Second, the Provincial Water Conservancy Research Institute to do Model construction. These work experience makes me more mature, ready to enter the community. Also, I personally although the body is smaller, but the physical condition is good. For the good and easy. I often give myself to wear such a top Hat: "pragmatic idealist"! Because to achieve the ideal must be pragmatic.

Although my student life is about to end, but my learning career is like the responsibility of the construction project is a life-long system.

工程維修人員英文自我評價 篇3

1, understand the drawings, information, equipment, cad and so on. Can be hard-working, enterprising. Responsible for the overall deployment of the construction site, the general layout.

2, coordination of the construction of the labor layer progress, quality, safety. The implementation of the overall construction program.

3, the service layer assessment, evaluation.

4, supervision of the service layer according to standard construction, to ensure safe production, civilized construction. Comprehensive and reasonable and effective implementation of the program to keep the construction site safe and effective.

5, proposed to ensure construction, safety, quality measures and organize the implementation.

6, urge the construction materials, equipment on time, and in a qualified state to ensure the smooth progress of the project.

7, to participate in the project completion inspection, responsible for the project intact protection.

8, on-time and accurate record of construction log.

9, the rational allocation of production factors, and strictly organize the construction to ensure project progress and quality.

10, the organization concealed project acceptance, to participate in sub-sub-project quality assessment.

11, to participate in the drawing of the trial and the preparation of the progress of the project with a grateful heart of life, with love to do uter skills: intermediate language proficiency: English (general); Mandarin (good) precise operation of equipment, cad, site coordination and management, pre-technical technology to the end of the quality axis elevation. Be familiar with and make drawings, data, construction plans, contracts.

工程維修人員英文自我評價 篇4

This practice makes me deeply feel the difference between theory and practice, from now on, not only to seriously learn the theory of knowledge, but also to focus on strengthening the practical hands-on ability to make their own more comprehensive development of a comprehensive development of the project, . At the same time, engineering measurement is also a technical live, it needs to measure personnel seriously, careful, patient; team members should also work together, as far as possible in all aspects of measurement to maintain a high accuracy, the only way to efficiently complete our Of the measurement tasks.

In fact, this measurement makes me feel the deepest is the close cooperation between the players, measurement has just begun, we are a group of nine people is not clear division of labor, the results of measurement work was very slow, but we soon found Measurement work is included in all aspects, and we immediately assigned a good task, have defined their own work, such as: in the measurement of elevation, the need for two feet to help the staff in two turning points to help leveling, a classmate Responsible for adjusting the instrument and readings, and a student is responsible for correcting readings, record data, in addition, there is a student specifically responsible for data checking, so, in order to ensure that the measurement of the surveyor's work smoothly; another example: We divided into three groups, one group with a steel ruler, the other with a tape measure at the same time, there is a group responsible for processing data and drawing. In this way, we have a clear division of labor, unity and cooperation, and efficient completion of our measurement work.

In addition, the measurement work is complicated and complicated, including many details, such as selecting the datum point, marking, installing the instrument, adjusting the level, setting the level of the ruler, aiming at the target, recording data, processing the data and checking the error. So many details, to say which is more important, in fact, each aspect is very important, each step can not be errors, or it may retest, to bring unnecessary trouble measurement. To give an example: a vertical ruler, a central level of a circular level, when the ruler to try to bubble in the middle position, which is a technical live, you need to Mozhun the law can be fast and accurate to the standard foot righting , But can not arbitrarily put the ruler to the ground a stand, otherwise it will make the data deviation and need to re-test, delay measurement process. Therefore, the measurement must develop a serious and careful work attitude.

The measurement practice, but also let me understand the hardships of construction and measurement of the importance of the work. In order to ensure that internships can be completed on time, our group members get up almost at six o'clock every morning, arrive at the measuring location, place the instruments, then take turns to eat breakfast, and sometimes do not take a nap at noon , The afternoon until dark can not see the time Hou back to dinner, to stay later also stay up to the day of data processing, often to 12 o'clock in order to go to bed ... ... the whole week is so, we all Very hard. However, in my view, although a little tired, a little hard, this a few

Days is my most fulfilling days. Because in the past few days inside, I not only learned a lot of classroom learning not the measurement of knowledge, but also to develop some good habits, which for my future development will be of great help. Measurement practice is about to end, I will sum up the practice of this pros and cons, find their own shortcomings, and through future efforts to learn to make up for my shortcomings, prepare for the future career in order to achieve greatersuccess!

工程維修人員英文自我評價 篇5

我畢業於山東工藝美術學院,室內設計專業,自認為在校學到了不少理論知識,熟練掌握 3dsmax、autocad、ps、sketchup、自學coreidraw、lumion,等軟件,職業期望偏向於店面設計/展覽/展示設計等一些商業空間設計,公司最好偏重於設計,希望貴公司給我這麼個機會,謝謝。

  • 文章版權屬於文章作者所有,轉載請註明 https://wjfww.com/jianding/pingjia/voeqv9.html
專題